name-project

NAME OF PROJECT

Panoroof glazing cell

client-moncobra

CLIENT: FORD WERKE GmbH

period-moncobra

PERIOD OF EXECUTION: June 2017 – September 2017

amount-moncobra

AMOUNT OF THE PROJECT: 475.000 €

NAME-OF-PROJECT-COLOR

DESCRIPTION OF THE WORKS

• Dismantling and scrap of old steelwork, lighting and cabling (500m2)
• New steel structure for panoroof glazing cell manipulator, design, supply, assembly on site – 5500kg
• New lighting Philips Maxos 4MX850 G2 491 1xLED66S. LED lamps 1479mm, 5500 Lumen 4000 Kelvin, DALI-control. 500Lux
• Power supply of new glazing cell cabinets, Verkabelung NYM-J 5x35mm², including connections. 200m.
• Compressed air piping for new manipulator, Stainless steel Pipe 1“ (DN 25, PN40) – 50m.
• Operator platform, supply and assembly of metallic structure for platform, performed with rectangular profile 80x80x3, and aluminum plate 4/6, and square reinforcements.

• Demolition, new slab & finishing – 200m2
-Joint cutting
-Mechanical/Manual cracking of existing reinforced concrete building floor, approx. 20 – 25 cm thick consisting of monolithic concrete with 2 layers of reinforcement
-Excavation up to a depth of -3.50m.
-Lean concrete C12/15
-Supply, cut, bend and fix reinforcement steel BSt 500 S. Range including spacers, chairs, joints, binders.
-Reinforced concrete C30/37, WU, XC4, F3
-Connection existing building floor / new concrete surfaces