IP Plant – facilities work

client-moncobra

CLIENT: FORD WERKE GmbH

period-moncobra

PERIOD OF EXECUTION: December 2016 – February 2017

amount-moncobra

AMOUNT OF THE PROJECT: 650.000 €

NAME-OF-PROJECT-COLOR

DESCRIPTION OF THE WORKS

Facilities works for the IP Plant Cologne. Roughly it contains a sub assembly conveyor (several proposals), a new belt conveyor for part delivery, adaptation of 2 belt conveyors to cover the new process allocation, plant engineering for the new assembly tables and modification of the existing steering column subassembly area. All the necessary work to support the facilities scope for B479 in the IP Plant:
• Substrate area sub assembly conveyor install
Clear area, 1.2 installation of assembly conveyor option a) ems 180 conveyor option b) power and free conveyor b.1 inverted b.2 overhead,option c) simp chain overhead conveyor mech.&elec.installation, programming, steel work, testing commissioning, plant engineering , network connection.
• Carrier design. carrier design incl. assembly fixture
design of frame and fixture manufature 1 3 frames and fixture, prototype installation, testing and commissioning.