NAME OF PROJECT

Installation of general lighting

client-moncobra

CLIENT: FORD WERKE GmbH

period-moncobra

PERIOD OF EXECUTION: January 2017 – April 2017

amount-moncobra

AMOUNT OF THE PROJECT: 103.000 €

NAME-OF-PROJECT-COLOR

DESCRIPTION OF THE WORKS

• 5 x installation of supply and control cabinets LPS 500W
• 51 x installation of Maxos emergency luminaires (mounted on Philips trunking type 4MX850 P 491 LED 8/840 PSD WB FU WH.
• 3 x installation aluminum LED safety lighting SAFE W – F + LED + DALI
• 3 x installation evacuation sign luminaire with pre-cast aluminum housing CYCLON 300 WM LED + DALI
• 25 x installation evacuation sign luminaire, CUBE30 LED + DALI
• 1200 m x Supply and installation of cables (NYM-J 5x 2.5mm²) and conduits (cable trays, ladders etc.)
• 1500 m x Supply and installation of cables (NYM-J 3x 4mm²) and conduits (cable trays, ladders etc.)
• 900 m x conduit and cable ducts.
• 10 x network connection CAT5 double connection up to 100m to the 5 security distribution boards.

• 2080 m x installation of all Philips Maxos LED strip light units 55S PSD WB consisting of:
– DIN rail, DV 7×2.5mm² (adjustable), IP 20, color white
– LED light beam wide beam (system length 1479mm each), 5500 lumens 4000 Kelvin, DALI driver
– System accessories (inlets, end caps, connectors, etc.)
• 1386 x Installation of Philips luminaries for trunking Maxos LED.
• 1200 m x Supply and installation of cables (NYM-J 7x 2.5mm²) and conduits (cable trays, ladders etc.)
• 250m x Supply and installation of cables (NYM-J 5x 35mm²) and conduits (cable trays, ladders etc.)
• Commissioning and start-up of new electrical installations (VDE TEST)